EDF Renewables in Germany is announcing the repowering of the Eckolstädt wind farm, the first in a series to come.
“Repowering” or renewing means the refurbishment of a facility that has reached the end of its life cycle. The Eckolstädt wind farm initially had an installed capacity of 14.5 MW, which has now been increased to 34.5 MW.
This repowering project contributes to the EDF Group’s CAP 2030 strategy, which is aimed at doubling its worldwide renewable capacity to 50 GW between 2015 and 2030.